Ochakovsky wind farm - generator replacement
The project to replace the turbine generator involved:
- 26 trucks;
- 100t LIEBHERR truck crane;
- our “flagship” is the LIEBEHERR LR1600 / 2 crawler crane assembled by us for lifting a generator weighing 8.7 tons to a height of 100 m in a configuration of 42 m main boom and 72 m jib.